Chenfan Electric
EN
Send drawing

PRODUCTTransformer cores

Distribution Transformer Cores

Factory-direct distribution transformer cores. Precise lamination processing and organised batch production keep your assembly line supplied.

Transformer-core stack on an assembly station

01 / Specification

Product specification

Application
Utility and industrial distribution transformers
Geometry
Single-phase or three-phase, to drawing
Material
Specified CRGO / GOES grade and thickness
Joint
Step-Lap sequence to the lamination schedule
Cut-edge control
Burr height <0.02 mm
Assembled stack
Stacking factor >97%

Burr height and stacking factor are manufacturing controls. Order acceptance is agreed for the specified material, coating, stack condition, drawing tolerances and measurement method; these figures do not guarantee transformer loss or efficiency.

02 / Supply

Core delivery formats

Cut CRGO laminations
Cut CRGO laminations

Delivery format

Cut laminations

Identified cut pieces for factories that build the joint, stack and clamp the core in-house.

Delivery: pieces grouped by the lamination schedule.

Lamination grouping at the pre-stacking station
Lamination grouping at the pre-stacking station

Delivery format

Pre-stacked packets

Counted lamination packets arranged in their stacking sequence for core assembly at your factory.

Delivery: identified packets with orientation and sequence retained.

Core assembly and clamping
Core assembly and clamping

Delivery format

Assembled core

The stacked magnetic circuit with the specified clamping structure, prepared for winding integration.

Delivery: core assembly with the specified accessories and handling provisions.

Supply scope

Built for repeat production

Each core design has a controlled material specification, lamination schedule and drawing revision. Identified lamination groups keep repeat batches organised from cutting through assembly.

Before ordering

Can several core sizes be quoted together?

Yes. Provide the drawing list, revision and quantity for each item. Material and production planning can then be reviewed across the full requirement without mixing the individual specifications.

Repeat production

Specify each distribution core before batch cutting

Drawing control
Drawing number, revision and quantity for every core size; keep different designs separately identified.
Material definition
CRGO grade, thickness and coating, with coil identification linked to the production batch.
Lamination schedule
Limb and yoke profiles, piece quantities, step-lap sequence and the required packet markings.
Assembly acceptance
Window, limb, centre-distance and stack dimensions, checked to the agreed drawing tolerances and measurement conditions.
First article and batch records
Agree whether first-article or sample-batch approval is required before repeat production. Define batch markings, sampling, inspection records and the receiving handover record in the order.
Delivery condition
Cut pieces, pre-stacked packets or assembled cores; identify the clamping and accessories included in the order.

Burr height and stacking factor are process controls, not stand-alone guarantees of transformer loss or efficiency. Finished-core testing, sampling and acceptance limits require an agreed test basis.

Review the material and dimensional inspection scope alongside the transformer core manufacturing capability.

Batch supply reference

Distribution transformer cores for Southeast Asia

Our existing project reference shows batch core production to customer drawings for a Southeast Asian customer. See the project photograph and recorded supply scope.

For a new or repeat enquiry, send the drawing list, quantities by size, material specification, delivery format and destination. Confirm the latest revision rather than relying only on a previous purchase-order number. Use the RFQ checklist to keep the quotation basis consistent.

RFQTechnical review

Send your core drawing

Include the drawing revision, material specification, quantity and destination.

    Chenfan Electric

    Direct coordination

    Start a conversation.

    A drawing, a material requirement, or a project to discuss.

    Send drawing